14 Jun Before I Book, information needed….
A few pieces of information you need to ensure you have before you call-
- Name and contact details
- Full site address incl postcode
- Date/ Time
- Amount of concrete required (if not the dimensions so I can work it out- length, width, depth in meters and ml)
- Brief idea what the concrete is for eg footings, slab, oversights, path, shed base
- Length of pipeline needed for the pump if hiring additionally. Over or under 40 meters.
- Any additional requirements such as fibers, retarders..
Sorry, the comment form is closed at this time.